Examples of Student Projects

Our students benefit from capstone projects to apply technical skills and hone soft skills. They help industrial sponsors solve real problems and make connections to jump start their careers. This is just a sampling of past projects.

Spring 2025 Capstone Projects

Applied Fabricators; Sheet Metal Count

Applied Fabricators; Production Scheduler

BraunAbility; Digital Twin

Eagle Materials

Spring 2023 Capstone Projects

Applied Fabricators - Preventative and Predictive Maintenance 

Applied Fabricators - Automated Sheet Stock Palletization

Arcamed - Manufacturing Layout and Product Flow for Existing and New Space

Descon - Facility Layout and Transition

Dormakaba - Distribution Center Optimization

Inventus Power - Manufacturing Improvement Project

Phoenix USA RV - RV Parts Digital Library Design

Photon Automation - Battery Submodule Assembly Line

Purdue Industrial Engineering - Manufacturing Lab Launch

Amazon: Reducing Scrap on SLAM Machines

Amazon: Reducing Downtime on SmartPac Machines

Amazon: Maintenance Bench Test

Diesel Forward: Wash Line and High-Pressure Blasting Automation

Dynamic Metals: Preventative Maintenance

Gem City Metals: Preventative Maintenance

GNC: Pallet Put Away Structure Project

HARPA: Noise Managing Headphones

Hupp Aerospace/Defense: ERP Recommendation

Indiana Tourism Association: Solar Eclipse Event Planning

Northstar Aerospace: Manufacturing Visual Controls

Penz Products: Insulated Foam Door Process Improvement

Purdue Student Success Programs: Testing Center Co-Location

Spencer County Visitors Bureau: Solar Eclipse Planning Logistics

Tesla: Megapack Production Line Simulation

Tramec Sloan: Fender Bracket Assembly

Tramec Sloan: Manufacturing Line Process Improvement

Tramec Sloan: Save-a-Load Bar

Woodard, Emhardt, Henry, Reeves & Wagner: Billing Workflow Project

Learn how our students can help you.

 

Other Examples of Previous Projects

  1. Maximize (process & supply for) car seat plastics recycling
  2. Optimize vegetable seed production across multiple global locations
  3. Initiate a newly purchased hydroponic growth system, layout the area, and assess efficient and effective work flow design
  4. Optimize bed count with hospital forecasts at multiple Indiana Neonatal Intensive Care Unit (NICU) locations  
  5. Reduce yield loss and environmental impact for our [product] production lines; process flow, identify loss points, quantify, prioritize losses, root cause, plan, implement, and estimated savings
  6. Design and recommend plant expansion layout: process mapping, flow analysis, simulation (Arena) of throughput and workstation design
  7. Design and implement a process control for food preparation and service to allergy sufferers in dining and catering services
  8. Aid data-driven decision making: evaluate and provide cost analysis of an IoT (Internet of Things) manufacturing monitoring platform
  9. Reduce clinician burnout and increase efficiency regarding electronic medical records activities
  10. Optimize transportation services to provide easy, safe, and supportive transportation for long term care clients' appointments
  11. Improve efficiency, effectiveness and accuracy of a sales forecasting model that includes a visualization tool, enabling quicker and more robust decision making
  12. Create an interactive chat bot for noise repair diagnostics 

Student Project Partners