May 6, 2016
Renovation of hydraulics tow tank to be completed this year
First built in the 1960s, the tow tank in the basement of Hampton Hall will be renovated by the end of 2016. According to Cary Troy, associate professor of civil engineering, the facility, owned by civil engineering's hydraulic and hydrologic engineering department, was built along with the building itself. It is designed to tow objects through a tank of water using a carriage at the top, which would allow researchers to measure, for example, the drag force from the fluid to the object.