Construction of Center for Aging Infrastructure
The Center for Aging Infrastructure (CAI) includes about 22 acres, as seen in the satellite image below, inside the area of the red line. It is being developed in stages, with the first stage (about 10 acres) shown inside the blue line. Some of the individual research areas have also been built with potential for many more.
The final stage shown inside the yellow line will be developed as need arises. In the mean time, the area inside the yellow line can still be utilized for any research or training purpose that might require a large area, excavation, tree felling, or any other unique research or training request. The acreage could be transformed as needed.
Current Project Highlight: Power upgrade
December 2016: Installation of electrical outlets is underway, as seen in the trench on the right. This will provide 120VAC power outlets at nearly each of the research pads for power tools, data acquisition, etc.
Phase I Construction Photos
The photos below show the progress as land was cleared and developed for Phase I construction completed in the fall of 2014.
(Click on photos to enlarge)
December 3, 2014
April 15, 2015
April 16, 2015
April 24, 2015
April 28, 2015