2001 Combined State Binder Group
Round Robin Data
 

Round Robin 2001-1   There were 69 participants in the first Round Robin for 2001.

                Summary A   -  includes all data separately

                Summary B   -  uses the average data from each laboratory which tested multiple Round Robin 2001-1 samples.


Round Robin 2001-2   There were 60 participants in the second RR for 2001.  

                Summary A   -  includes all data separately

                Summary B   -  uses the average data from each laboratory which tested multiple Round Robin 2001-2 samples.


Round Robin 2001-3   There were 64 participants in the third  RR for 2001.  

                Summary A   -  includes all data separately.

                Summary B   -  uses the average data from each laboratory which tested multiple Round Robin 2001-3 samples.

                Summary C   -  data from the eight labs who were sent RR99-3 samples.


Round Robin 2001-4   There were 61 participants in the final RR for 2001.  

               Summary A   -  includes all data separately

               Summary B  -  uses the average data from each laboratory which tested multiple Round Robin 2001-4 samples.


Beginning with RR 2001-1 WisDOT will notify Round Robin participants of any tests for which their data was determined to be a statistical outlier.  An outlier is defined as that data which is outside of three standard deviations from the average.  The determination of outliers is an iterative process.  The notification will be contained in a letter attached to the summary report.  The participant shall have 30 days to provide WisDOT with a response as to the apparent cause of the outlier.  Failure to respond within 30 days will result in loss of certification for certified suppliers as detailed in the Combined State Binder Group Method of Acceptance for Asphalt Binders, March 2001.

Specification Chart

Binder Group State Contacts


Back to Technical Information

Return to Home Page 


Round Robin Data 2001 - Table of Contents

© 1997 North Central Superpave Center

E-mail your comments to: ncsc@ecn.purdue.edu

Last modified: March 20, 2007