[BNC-all] BNC E-news for the week of October 7th

Anthrop, Heather L hanthrop at purdue.edu
Fri Oct 4 13:00:39 EDT 2013


Electrical Shutdown
Maintenance
Medical Plan Presentations (2014)
Parking
Purchasing

**Electrical Shutdown**
During the semiannual PM shutdown there will be several electrical shutdowns to make tie-ins for the laboratory expansion projects. Please be aware of these shutdowns and arrange your schedule accordingly.

The most significant shutdown will take place Tuesday, 8 Oct 2013, from 7:30 am - 8:30 am. During this shutdown, power will be off to most of the offices on the west side of the building - including lighting. Please power down computers and other critical office equipment prior to the shutdown. Additionally, other important building functions may be affected:

*         ITAP computer closets - it is possible that the entire building will lose the computer network during that time

*         West door to the building - the door will lock down

*         Card Reader system - this shutdown may affect the card reader system, and therefore access to the laboratories

*         Elevators - the elevators will be locked down on the first floor

*         Fire panels - we may hear the trouble alarm in the atrium

*         Convenience outlets in the west galleys

*         Atrium lighting - some or all of the lights in the atrium may be affected
Please note that we are depending on the building drawings and panel schedule for this information. While we believe these to be correct, there is always the possibility that the contractor who built the building made a mistake on a panel schedule and an unforeseen area may lose power.

Monday, 7 October 2013 (afternoon) and Wednesday, 9 October 2013 (morning) some of the power for emergency lighting will be shut down for 1-hour periods. This will not have a significant effect, but you may see lights shutting off during those times.

Please note that the normal PM communicated previously will be going on during these shutdowns.

Thank you in advance for your understanding and cooperation during these shutdown events.

John Weaver                                                   Mark Voorhis
Facility Manager                                             Building Manager

**Maintenance**
The Birck Nanotechnology Center will be undergoing a semi-annual preventive maintenance and service shutdown October 7 through October 11, 2013.  Air handling systems, exhaust systems, toxic gas delivery, and monitoring systems will be down beginning at 7 a.m. Monday, October 7 through 4 p.m. Friday, October 11.  The BNC staff will be performing appropriate preventive maintenance on the process equipment at this time as well.

All CLEANROOM research work will be suspended until the maintenance activities are completed and all systems are returned to normal.  No one will be allowed to enter the cleanroom during this time period.

In addition, the laboratory areas will also be affected by this systems maintenance.  As such, all LABORATORY activities that involve exhausted hoods, vacuum systems, and/or toxic gas systems will be down beginning 9 a.m. Monday, October 7 through 4 p.m. Friday, October 11.  However, work that involves taking standard electrical measurements may be carried out in the LABS provided that fluctuating air temperature and humidity do not affect the readings.  No chemical work will be allowed during this period.

It is anticipated that the building and process tool maintenance will be completed by the end of the day on Friday, October 11.  Please check Coral for equipment status and availability.

Due to the new lab expansion projects electrical outages are required that will mainly affect the office areas.  We will send out a notice with a date and time of the power outage when we have more detailed information from Physical Facilities.

For long term research planning please refer the following future dates for our future preventive maintenance shutdowns.


  *   Week of May 5, 2014 (Possible power outage of lab research tools)
  *   Week of October 13, 2014
  *   Week of May 4, 2015
  *   Week of October 12, 2015
  *   Week of May 2, 2016

Thank you for your cooperation and understanding during these important preventive maintenance shutdowns.

BNC Management

**2014 Medical Plan Presentations**

OVPR/DP will offer two sessions to explain the 2014 medical plan options.  Each session will last approximately 90 minutes and will include a presentation by Benefits along with a question and answer session.  Please plan to attend, if possible.



Monday, October 14, 2-3:30pm, MRGN 121

"Health Care: Moving Forward in 2014" reviews dynamics affecting Purdue's medical plans, highlights Purdue's proactive steps to control costs while continuing to provide high-quality, affordable health care for faculty and staff, and gives an overview of all three 2014 medical plan options.



Wednesday, October 23, 9-10:30am, MRGN 121
"Is a High-Deductible Medical Plan Your Best Choice?" covers how a high-deductible medical plan with a health savings account (HSA) works. The session explores questions people commonly have when considering a move to a high-deductible medical plan and looks at the advantages of an HSA.



If you are not able to attend these sessions, Benefits will add recorded versions of these presentations to their website this week.  Pease visit www.purdue.edu/benefits<http://www.purdue.edu/benefits>.

**Parking**
Friday, October 11th 20 parking spaces in the West lot will be reserved for an event in Discovery Park.

**Purchasing**
TODAY, Friday, October 4th is the last day to place an order in SRM purchasing system. For any questions or concerns please interim Business Manager Donna Brown room 1012.




-------------- next part --------------
An HTML attachment was scrubbed...
URL: </ECN/mailman/archives/bnc-all/attachments/20131004/d2e1d06c/attachment.htm>


More information about the BNC-all mailing list