Some of the numbers in Tables 1 and 2 in the ACM DL version of the paper are wrong: in particular, the number of nodes traversed for point correlation with lockstepping on the geocities input, and the work expansion numbers for point corrleation. The version of the paper provided here has the corrected numbers.