All Research Projects

SPR-4862: Synthesis Study on Applying Solar Power Systems in Indiana's Righ of Way (ROW) and INDOT-Owned Facilities

Principal Investigators Soowon ChangYunfeng Chen
Start Date - 12/01/2023

The synthesis study aims to summarize the current state of the art and practice related to implementing solar power energy systems in Indiana Right of Way (ROW) and INDOT-owned facilities, identify potential ROW sites suitable for the development of solar energy systems, and specify the considerations and requirements for the development, implementation, and maintenance of the projects within the proposed sites.


SPR-4861: Updating Cost Allocation and Revenue Attribution

Principal Investigators Samuel LabiKumares SinhaNadia Gkritza
Start Date - 12/01/2023

Indiana’s road expenditures are financed primarily by highway user fees. The basic principles of highway financing are user-fee equity and statewide revenue adequacy. It is only through analysis of past costs and revenues that Indiana can develop an equitable pricing structure for its road users and an efficient revenue generation system to cover expenditures. Such studies are needed periodically to ensure user equity and revenue efficiency keep pace with changing travel demand and distributions, construction technology and materials, and above all, new/emerging vehicle technologies including electrification. This proposal is based on a request made to INDOT by Indiana’s Legislature, to update Indiana’s 2016 Cost Allocation Study. The goal is to measure/predict/address the impacts of alternative-fuel technology (particularly, electric vehicles) on Indiana’s highway revenue adequacy and equity.


SPR-4860: Environmental Product Declaration (EPD) Benchmark Project for Indiana Asphalt and Concrete Pavements

Principal Investigators John Haddock
Start Date - 01/01/2024

Environmental product declarations (EPD), in conjunction with mixture and pavement testing will provide data and a framework for guidance to make decisions for a high-quality and more sustainable asphalt and concrete mixtures. The data will be used to create benchmarks for Indiana asphalt and concrete mixtures and their environmental impact using EPD reports.


SPR-4857: Statewide Screening of Signalized Intersections for Capacity Improvements

Principal Investigators Darcy Bullock
Start Date - 07/01/2023

The 13 billion connected vehicle records Indiana ingests each month provide the opportunity to perform network wide analysis that has never been done before, but in its native format (3 second latitude and longitude positions), the connected vehicle records are data rich, information poor (DRIP). The objective of this project is to reduce this data set down to a table of metrics that can be used by INDOT to identify capital improvement projects on both a corridor and a movement by movement basis for signalized intersections on INDOT highways.


SPR-4856: Receiver, Vehicle, and Roadway Systems for a Dynamic Wireless Power Transfer Roadway Testbed

Principal Investigators - John HaddockDionysios Aliprantis, Aaron BrovontNadia GkritzaSteven Pekarek
Start Date - 09/01/2023

This project will support the installation of a one-quarter mile long dynamic wireless power transfer (DWPT) testbed on northbound US-231 in West Lafayette. At the end of this project, INDOT will have a fully functional pilot DWPT constructed and key testing of the performance of the system will be performed.


SPR-4855: Anomaly Detection in Traffic Patterns Using INDOT Camera System

Principal Investigators - Lauren Christopher (IUPUI), Stanley Chien (IUPUI), Yaobin Chen (IUPUI)
Start Date - 08/01/2023

INDOT cameras at each highway location can provide lane-level traffic flow data from TASI’s previous project. The primary goal for this project is to identify anomalies in traffic data patterns using a trained Neural Network, and store short video recordings of these anomalies as they are detected for review. The Neural Network can be trained using previously obtained week, month, or year traffic flow data and be used to distinguish in-distribution from out-of-distribution by comparing new data to the previous data. 


SPR-4854: MOT for MOT

Principal Investigators Darcy Bullock
Start Date - 07/01/2023

Developing a shared vision among stakeholders and a “playbook” on MOT for MOT is highly desirable. Well designed temporary MOT procedures and standards are important to ensure safe operation of the work zone during MOT change. Developing a shared vision between designers, contractors and work zone subcontractors on how to design MOT during MOT will provide safer work zones for both contractors and motorist.


SPR-4853: Effective Shoulder Width on Rural Highway System Related to Roadway Departure Crashes

Principal Investigators Andrew TarkoMario Romero, Jose Thomaz
Start Date - 08/15/2023

This study will evaluate the safety effect of shoulder width in rural areas under different road and traffic conditions to avoid unnecessary construction costs (too wide shoulders) and/or excessive road users costs (too narrow shoulder widths). Estimated Crash Modification Factors or Functions (CMFs) at three levels of crash severity will help develop a proper level of design depending on the road curvature and the character of the surrounding terrain. The average costs of offroad crashes under various traffic and road conditions will be estimated to be used in benefit-cost analyses.


SPR-4852: Safety Performance of Centerline Paved Pavement Markers

Principal Investigators Andrew TarkoMario RomeroJose Thomaz
Start Date - 08/15/2023

The study will estimate the safety effect of raised pavement markers (RPMs) installed on Indiana rural two-lane roads with various road horizonal alignments. The results will include Indiana Crash Modification Factors/Functions (CMFs) to support effective use of RPMs in conjunction with other safety improvement solutions. The CMFs at three levels of crash severity outcome will be implemented in the Indiana safety management and its decision making. The project is also aimed to evaluate the safety effectiveness of the centerline RPMs applied in combination with rumble stripes to identify the conditions where this joint treatment is advantageous. Specific recommendations will be provided for specific traffic conditions, speed, and roadway characteristics.


SPR-4851: Development of Incident Management Performance Measure Database and IN Time Training Material

Principal Investigators Darcy Bullock
Start Date - 07/01/2023

This project will develop a series of after-action analyses using connected vehicle data (and cameras where available). These after-action analyses will be used to populate a statewide database to identify regions of the state where there may be an opportunity to do some IN Time Training. Furthermore, assembling a series of after actions that illustrate good practices (and perhaps some less than good practices) will provide foundational training material that IN Time trainers can use.


SPR-4850: Continued Deployment of Indiana Work Zone Analytics

Principal Investigators Darcy Bullock, Jairaj Desai
Start Date - 07/01/2023

This project will support the weekly work zone reports that are distributed to over 100 stakeholders around the state to show changes in weekly crash rates, changes in connected vehicle hardbraking, and changes in congestion. Those reports have been extremely successful in rapidly identifying work zone MOTs that have opportunities for improvement.


SPR-4845: Investigate Existing Foundation Geotechnical Parameters and Compare These Strengths, Based on Current LRFD Codes

Principal Investigators - Erik Loehr (University of Missouri), Brent Rosenblad (University of Missouri), Andrew Boeckmann (Dan Brown  & Associates)
Start Date - 01/01/2024

The project will create standardized procedures for reuse of existing bridge foundations that include two important components: (1) field investigation methods and (2) design procedures. Application of the procedures will result in more applications of foundation reuse, greater consistency among reuse projects, more efficient design processes, and substantial cost, time, and mobility savings associated with foundation reuse.


SPR-4844: Analysis of DownDrag Loads Using the Neutral Plan Method

Principal Investigators Monica PrezzRodrigo Salgado
Start Date - 04/30/2024

INDOT developed a preliminary procedure internally to locate the neutral plane. To assess the validity of its procedure, INDOT has identified a construction project on US 31 in Marshall County to instrument and monitor..The research tasks of the project include analyzing the data collected over time from the strain gauges installed on the test pile, performing a few numerical simulations of the test pile under field conditions to help with accurate location of the neutral plane, assessing INDOT’s procedure for location of the neutral considering the data collected in this construction project and the result of the simulations, suggesting modifications to INDOT’s procedure as needed, based on the data analyses, and proposing guidelines for future projects in which downdrag must be considered.


SPR-4843: Advancing Accelerated Bridge Construction and Fabrication in Indiana

Principal Investigators - Ashley Thrall (University of Notre Dame)
Start Date - 05/01/2024

The proposed research aims to increase the use of accelerated bridge construction (ABC) and accelerated bridge fabrication (ABF) in Indiana as these technologies have the potential to address INDOT needs related to improving construction time (both onsite construction time and total project delivery time), project cost, and work zone safety (for both the traveling public and construction workers). The focus would be on the scoping stage, with the goal of triggering which projects are candidates for ABC or ABF early in the process. Research will culminate in guidelines and recommendations for implementing ABC/ABF in Indiana.


SPR-4841: Investigation into the Fatigue Strength and Ductility of Steel Plates with Holes made from Plasma Cutting Methods

Principal Investigators Robert Connor
Start Date - 11/01/2023

This project will perform a study to examine and synthesize all of the existing data related to the use of plasma cutting to place holes in steel components. While this method is very efficient resulting in cost and time savings, questions remain regarding the possible effect on ductility and fatigue life as compared to traditional hole drilling techniques. The results will be used to craft a detailed experimental program should additional data be needed.


SPR-4840: Physics-based Modelling of Concrete Degration Phenomena: Impact of Constrcution Defects on Long Term Cost and Material Properties

Principal Investigators Shirley DykeJulio Ramirez
Start Date - 12/01/2023

This project aims at providing a methodology to quantify the additional costs that certain construction defects (with excessive air voids, in thin and rigid deck overlays) will have on the service life of a bridge deck. The performance of the deck throughout its life span will be described using the concepts of durability and service load performance such as cracking and deflections. A stochastic chemical-mechanical model will be developed, for both standard and non-standard construction cases, including the effects of properly and improperly executed interventions on the concrete deck. Recommendations will be identified.


SPR-4839: Evaluation of Utilizing 3D GPR for Quality Assurance of Bridge Deck Rebar Cover and Delamination Screening

Principal Investigators - Dwayne Harris (INDOT)
Start Date - 09/01/2023

The main objective is to verify that INDOT’s 3D GPR system will provide rebar cover thickness estimates that are accurate and precise enough to be utilized for quality assurance (QA) of rebar cover thickness for newly constructed bridge decks. The research will also examine utilizing the 3D GPR for delamination screening.


SPR-4838: Automated Personalized Ergonomic Risk Report Generation System

Principal Investigators Yunfeng ChenJiansong ZhangYiheng Feng
Start Date - 09/01/2023

This project aims to develop an automated and holistic ergonomic risk evaluation system for INDOT workers performing transportation-related activities. It will identify activities of high ergonomic risks, explore required physiological and behavioral data, pinpoint root risk causes and potential solutions, and develop approaches to automatically generating personalized risk reports.


SPR-4837: Preventative Flagging Operations for Enhancing Stationary and Mobile Work Zone Safety

Principal Investigators Sogan Hasanzadeh, Behzad Esmaeili, Prandon Pitts
Start Date - 09/15/2023

This project assesses flagging operation alternatives to better protect flaggers who work in dangerous environments, provide motorists with more effective traffic and warning, and develop a decision-making matrix based on contextual analysis to help select the most appropriate work flagging operation practices depending on a roadway, work zone, and activity characteristics.


SPR-4836: Best Practices for Implementing Driving Simulators in INDOT Driver Training

Principal Investigators Luciana Debs, Soowon ChangYunfeng ChenJiansong Zhang
Start Date - 07/01/2023

Driving simulators can provide many benefits, such as safely training drivers for adverse weather and road conditions. However, there is a lack of information about the effectiveness of this type of training and initial equipment cost is expensive. Therefore, the present project provides INDOT with best practices in the use of driving simulators in their driver training programs by (a) identifying ideal modules for new INDOT CDL drives and snowplow drivers, trainees’ perceptions, and performance, and (b) elaborating a business case that explores other agencies experiences and potential to maximize the equipment investments to state constituents.


SPR-4835: Integrated Smart Workzone

Principal Investigators Sogan HasanzadehBehzad EsmaeiliYiheng Feng, Su Lu
Start Date - 10/15/2023

This proposal aims to enhance work zone safety by developing an integrated and holistic IoT‐based smart work zone system that can be applied to enhance mobile and stationary work zone safety.


SPR-4834: Riprap and Aggregate Polyurethane Stabilization for Drainage, Erosion Control and Road

Principal Investigators - Erol Tutumluer (University of Illinois Urbana-Champaign)
Start Date - 08/16/2023

This study presents a comprehensive investigation of polyurethane-bonded aggregate layers for drainage and erosion control applications in two phases.  In Phase 1, laboratory tasks include identifying suitable aggregate sources, characterizing physical properties, optimizing mix proportions and mixing methods, and conducting comprehensive laboratory testing. Phase 2 focuses on site selection, construction, and in-situ performance monitoring. The study aims to optimize design parameters, assess environmental impact, and provide guidelines for successful implementation of polyurethanebonded aggregate technology.


SPR-4833: Non-destructive Roller-Integrated Acoustic Wave Detection Technique for Continuous Subgrade Soil Compaction Evaluation

Principal Investigators - Sarah Khoshnevisan (University of Cincinnati)
Start Date - 08/01/2023

This research project aims to revolutionize the evaluation of compaction levels and uniformity at construction sites by implementing cutting-edge non-destructive methods. By utilizing this innovative methodology, we anticipate significant benefits such as time savings, reduced labor requirements, cost savings, and a more comprehensive assessment of compaction across the entire site.


SPR-4832: A Digital Inspection System for Training Construction Inspectors

Principal Investigators - Hubo CaiDulcy Abraham
Start Date - 08/01/2023

Construction inspection is critical to the quality and long-term performance of infrastructure assets.  There is a critical need for effective tools to train novice inspectors and provide updated information for experienced inspectors. This project develops a digital inspection training system. Main deliverables include a digital inspection training system for on-demand training of inspectors, and a training program that can be integrated with INDOT’s learning system.


SPR-4830: Moisture Control and Performance Evaluation for Asphalt-Treated Cold Recycled Pavements (CIR and FDR)

Principal Investigators - Seonghwan Cho (INDOT), John Haddock
Start Date - 03/01/2024

The main objective is to establish a practical method to optimize the curing process of ATCR pavements based on the measured moisture contents, and thereby to achieve desirable pavement performance. The accuracy of electrical resistance and GPR measurements for moisture content prediction will be evaluated, and a more accurate and practical method will be selected as a quality control tool. In addition, the effect of moisture content on ATCR material performance will be evaluated to determine the optimum moisture content. Consequently, this study will provide well-established protocol to determine when the ATCR pavements achieve desirable performance to be opened to traffic, based on the moisture contents.


SPR-4827: Develop a Perfromance-Related QA Testing Method for Accepting MSE Wall Coarse Aggregate Reinforced Backfill Compaction Acceptance

Principal Investigators - Peter Becker (INDOT)
Start Date - 01/01/2024

INDOT intends to only allow coarse aggregates for MSE wall backfill. Accepting compaction of such materials currently requires a method specification approach in which acceptance is based on how well the contractor follows a prescribed construction methodology that requires constant supervision from project inspection personnel.  This research study aims to develop performance-related acceptance criteria and/or testing procedures for MSE wall backfill compaction.


SPR-4824: Understanding of Reflective Cracking Using Accelerated Pavement Testing

Principal Investigators - Jusang Lee (INDOT), John Haddock
Start Date - 03/01/2024

Outcomes from the proposed project will provide a better understanding of asphalt mixture overlay reflective cracking and improved calibration factors for use in the PEMD software.


SPR-4823: Systematic Study of Type 1L Cement for Mixture Optimization and Carbon Reduction

Principal Investigators Na (Luna) Lu, Yining Feng
Start Date - 09/01/2023

Portland limestone (i.e., Type 1L) cement is being used to replace ordinary Portland cement to reduce carbon emissions. The reduction of around 10% of cement clinker and its replacement with limestone powder can greatly reduce the energy consumption by cement production.  This project will conduct a comprehensive study on the performance of Type 1L cement provided by various suppliers. It will thoroughly investigate all performance related properties, including but not limited to, fresh properties, air void system, mechanical strength, and durability of the hardened concrete, etc.


SPR-4822: Implementation Studey for In-Place Testing of Asphalt-Treated Cold Recycled Pavements

Principal Investigators John Haddock
Start Date - 01/01/2024

This research will evaluate existing in-place mechanical test methods and provide guidance on the methods for use with cold recycled asphalt mixtures, specifically, FDR, CIR, and CCPR. The results of the selected test, or tests can then be used to make time critical decisions regarding final surface placement and traffic resumption on the recycled pavements. Additionally, the research will determine PEMD design inputs for FDR, CIR, and CCPR recycled pavements for use in designing such pavements.


SPR-4821: Vlidating Construction Practices and Material Performance Through Non-Destructive Testing: A Case Study Approach to Documenting Project Quality

Principal Investigators Jan Olek
Start Date - 01/01/2024

INDOT Asset Management group is embarking on a multi-decade plan to update main rural interstate corridors with full depth reconstruction and added travel lanes. The proposed research will collect, document, and analyze data from two ongoing (active) projects to refine the existing draft version of the Unique Special Provision (USP). Subsequently, the refined USP will be used during the construction of two pilot-projects (“Case Studies”) with the goal to quantify the quality and reliability of the constructed product.


SPR-4820: Enhanced Methods to Evaluate Flexible Pavement Moisture Damage and Interface Bonding Conditions Using the 3D Ground Penetrating Radar and Falling Deflectometer

Principal Investigators - Seonghwan Cho (INDOT), James KrogmeierJohn Haddock
Start Date - 09/01/2023

The main objective is to develop methodology to evaluate the potential of flexible pavement distresses related to moisture damage and layer interface debonding based on the 3D GPR and FWD deflections. A field investigation will be conducted to establish a framework to identify moisture damage and layer interface debonding using the 3D GPR data. Relationships between FWD deflections and degree of layer interface bonding will be identified using numerical analyses and field investigation. Consequently, a new practical protocol will be developed to evaluate the moisture damage and layer interface bonding conditions of in-service flexible pavements based on 3D GPR and FWD data.


SPR-4819: Synthesis Study: Review of Durability and Performance of the Latest Epoxy-Coated Rebar

Principal Investigators Julio Ramirez
Start Date - 12/01/2023

The content of this comprehensive synthesis study will summarize the state-of-the-art in epoxy-coated reinforcing steel used in bridge concrete structures with two deliverables at Months 8 and 10. The final report will summarize Deliverables 1 and 2 containing the latest knowledge in epoxy-coated bars with regards to use, durability, performance, and DOT practices related to corrosion protection systems. The use of epoxy coated bars together with adequate concrete cover and quality of concrete offers the potential to extend the concrete bridge service life at a fraction of cost and downtime compared to methods without significant financial burden serving the users well into the future.


SPR-4816: Pedestrian and Bicyclist Trespassing Implacts on Rail Grade Crossings Safety and Mobility

Principal Investigators - Shangyu Guan
Start Date - 09/01/2023

This project will investigate pedestrian and bicyclist violations at highway-rail grade crossings. Data on pedestrian and bicyclist violations will be collected from existing INDOT and FRA records, and traffic video surveillance. A marginal analysis will be adopted to quantitatively explain the marginal effects of each independent variable on each injury level. Based on discussions with INDOT several grade crossings will be selected as a testbed to conduct this research. At the end of this project, our team will provide INDOT with some suggestions to improve the highway-rail grade crossing safety in Indiana.


SPR-4815: Development of Dashboards and Procedures for Using Connected Vehicle Data to Prioritize Investments in Electric Vehicl Related Infrastructure

Principal Investigators Darcy Bullock, Jairaj Desai
Start Date - 08/01/2023

Dashboards and Monthly Reporting procedures will be developed and standardized in conjunction with input from the SAC over the course of this project. These dashboards and reports will be used to assess the implementation of Indiana’s EV Infrastructure Deployment Plan as well as the growth of Electric Vehicle adoption in the state. Such reporting will additionally help identify AFCs and Intercity Travel routes most preferred by drivers for EV usage as a reference for future investment and corridor development.


SPR-4812: The Business Case for Sustainable Road Infrastructure Development

Principal Investigators Samuel LabiKumares SinhaNadia Gkritza
Start Date - 09/01/2023

This study will identify sustainable development (SD) opportunities at each phase of infrastructure development; identify/demonstrate exposure metrics for sustainability assessment; document/evaluate trends in SD metrics in Indiana’s transportation; identify carbon credit markets that Indiana could partake; develop SD business-case framework; assess SD impacts on other sectors; and identify ways to integrate SD into INDOT’s culture.


SPR-4811: Simulating Current and Future EV Growth Scenarios in Indiana

Principal Investigators Satish UkkusuriNadia Gkritza
Start Date - 10/16/2023

The project will integrate the current and future demand scenarios developed from SPR 4706 and understand the supply side impacts of EV growth using metrics related to travel patterns, demand at charging stations, trip lengths, charging station usage and return on investment. The project will further the EV strategic planning of the Indiana.


SPR-4810: Feasibility of Utilizing Native Grasses and Other Vegetation In Lieu of Exotic Cool Season Grasses

Principal Investigators - Jeffrey Matthews (University of Illinois Urbana-Champaign), Rabin Bhattarai (University of Illinois Urbana-Champaign)
Start Date - 07/01/2023

This project will develop recommendations and an updated specification of native seeding mixtures for planting on INDOT’s right-of-way (ROW) areas. Specific objectives are to: (1) Evaluate previously planted ROW locations to determine long-term planting success, and (2) Develop recommendations for updating INDOT seeding standards to focus on predominantly native seed mixes that would be applicable in various ROW settings. Specific deliverables will include progress reports to INDOT, a final report to INDOT with recommended specifications, a manuscript for publication in a scientific journal, and a presentation at a regional or national scientific conference.


SPR-4809: Cost Effectiveness of Weed Control Under Fixed Objects (Guardrail, Cable Barrier, etc.)

Principal Investigators - Beverly Storey (Texas A&M Transportation Institute)
Start Date - 10/01/2023

The findings from this research will assist INDOT selection process for determining vegetation management strategies for roadsides and roadside appurtenances treatments. Deliverables include final report and Excel®-based tool will include costs regarding initial installation, retrofit applications and projected lifetime costs for long-term vegetation management.


SPR-4808: Reducing the Dependency on Chlorides & Impacts

Principal Investigators - David YuSamuel Labi, Amisha Shah
Start Date - 01/01/2024

This project will develop an agency-level program initiative to reduce the use and impacts of chlorides while not compromising the state’s traffic safety and flows in winter times. A three-pronged approach will be used to aid INDOT in developing this future strategy: (i) a comprehensive and comparative analysis of different de-/anti-icing materials and their impacts; (ii) an analysis of operational rules, methods, and tools that crew and staff use in the stages of storage, transporting, and application of chlorides, and (iii) development of a pilot “awareness” program for the INDOT workforce that promotes a culture of sensitivity and discreteness toward salt usage.


SPR-4807: Mobile Work Barrier Implementation Study

Principal Investigators Sogan Hasanzadeh
Start Date - 11/01/2023

This project aims to provide a comprehensive guide and implementation plans for successfully adopting the mobile barrier as a positive protection system and enhancing work zone safety.


SPR-4806: INDOT Training Gap Analysis, Developing a Training Program for INDOT Workforce Development (new, Front-line and Supervisors) and Smart Tool for Effective Planning for Workforce

Principal Investigators - Steven Dunlop, Satish UkkusuriYunfeng Chen
Start Date - 10/15/2023

The public transportation agencies in the Department of Transportation (DOTs), face significant challenges in retaining the workforce that threaten the sustainability of their operations. INDOT needs a systematic and thorough assessment of current workforce development needs by conducting a gap analysis, prioritizing workforce development needs, and proposing 2 or 3 executive courses targeting the gaps. This study will allow for developing a strategic plan for the next five years.


SPR-4805: The Development of a Comprehensive Training and Toolkit for Recruitment and Retention of Women and Racial Minoritites in the Heavy Highway Industry

Principal Investigators - Charlotte Westerhaus-Renfrow (IUPUI)
Start Date - 01/05/2024

This project will take INDOT’s current affirmative action data and develop a comprehensive training and toolkit for recruitment and retention of women and racial minorities in the heavy highway industry.


SPR-4804: Roadside Right-of-Way Maintenance Strategies

Principal Investigators - Cheryl Daniels (Davey Resource Group, Inc.)
Start Date - 11/01/2023

Vegetation management BMPs will be updated through improved work planning, updated design standards, and identification of new tools and technology to identify potential cost savings. These updates will increase staff safety; reduce vegetation management hours; improve processes and procedures, asset preservation, design standards, and specifications; and provide a better understanding of the public’s desires for roadside aesthetics. This research will result in the creation of an interim report, a final report, and multiple implementation activities.


SPR-4803: Communication of Fixed and Mobile Warning to Commercial Trucks Using In Cab Notification

Principal Investigators Darcy Bullock
Start Date - 10/01/2023

This project will develop a working group including INDOT District and Central Office staff to coordinate with commercial vehicle in cab telematics companies to develop process for providing both automated and manual alerts to commercial trucks in Indiana. We plan to use CV data to evaluate an Ohio deployment to help inform us on best practices and expected impact.


SPR-4801: INDOT Agency Wide Sustainability Assessment and Roadmap for Future

Principal Investigators - James Handy, John Mulrow
Start Date - 05/01/2023

The INDOT executive team revisited agency goals about sustainability efforts including what is currently being done and how they can drive some new initiatives in the agency. The executive team wants to use JTRP to baseline what is happening in sustainability at INDOT and what is the roadmap for the future. Purdue MEP will develop a Sustainability Assessment, use the assessment to interview about 90 people that are Director level, evaluate the assessment information, provide recommendations with cost estimates, recommend metrics for sustainability and look for implementation that can be done in the short term.


SPR-4800: Assessing the Asset Management Programs of Locals including Bridges and Pavement Condition

Principal Investigators Samuel LabiKumares Sinha
Start Date - 08/01/2023

The study will examine what trends exist specifically at the town level and is expected to lead to possible recommendations geared towards the smaller communities. The study will examine the effect of increased “buy-in” at the local level through AMS on overall asset conditions, the quality of current AMS, and if there exist any areas of teaching/best practices that could help communities that may not be using their AMS to make decisions at the local level.


SPR-4754: INDOT Research & Development Testing Assessment

Principal Investigators - James Handy
Start Date - 07/01/2023

INDOT Research and Development wants an assessment of their current testing areas related to their Specialized Testing Programs (STPs), both current and projected. The requests for testing under the STP continue to increase, in some cases exponentially. Resources needed (e.g., equipment, manpower, budgets, etc.), current capacity, expected increase in capacity, and data analytics scope need to be standardized and captured to make the proper management decisions to properly plan for the current and future STPs. This project will address these concerns and needs and will result in a functional prototype process and analysis program.


SPR-4753: Implementation Grant: Feld Implementation of Concrete Strength Sensor to Determine Optimal Traffic Opening Time

Principal Investigators Na (Luna) Lu
Start Date - 03/01/2023

The purpose of this implementation project is to develop the standard testing procedures and protocols for field implementation of concrete strength sensor developed at Purdue and Indiana Department of Transportation (INDOT). The properties that will be monitored include the set time and strength development profile of concrete structures. A detailed cost/benefit analysis of this method along with a set of recommendation for traffic opening time and maintenance schedule will be conducted during the program.

This project was completed as of February 7, 2024. A final report is pending.


SPR-4751: Investigation of Low Friction on Asphalt Pavements

Principal Investigators - Jusang Lee (INDOT), Shuo Li (INDOT), Yi Jiang
Start Date - 01/01/2023

Over the course of three years, Crawfordsville District has discovered low friction results on 12 sections of roadways that were overlaid within three years of each other. Finding a cause (s) and a solution to the low friction is critical in providing drivers with skid-safe roadways.


SPR-4744: Investigate Safety Perfromance of Non-Signalized Traffic Control Strategies

Principal Investigators Andrew TarkoMario Romero
Start Date - 11/15/2022

This project will study safety performance of conflict warning and other operational improvements applied at non-signalized intersections in Indiana and other states.


SPR-4743: Traffic Managment Geocast Study with Connected Vehicles on Indiana Highways

Principal Investigators - Yaobin Chen (IUPUI), Feng Li (IUPUI)
Start Date - 09/01/2022

We propose to design and implement an innovative connected vehicle application, named RampCast, to conduct an INDOT traffic management centered geocast feasibility study and develop the connected vehicle’s implementation and research capacity. We will use the actual traffic data of Indiana highways and an open-source V2X software development toolkit (V2X SDK) to develop Rampcast and test the tool on the evaluation toolkit, together with compatible devices with high flexibility, such as the Software- defined radio (SDR) devices.


SPR-4742: Development of Web Port for the Management, Visualization, and Analysis of Collected Mobile LiDAR Data along Indiana's Transportation Corridors

Principal Investigators Ayman HabibJinha Jung
Start Date - 01/01/2023

This project is dealing with the development of a web portal for the visualization of collected transportation corridor LiDAR data and generated products throughout the state of Indiana. Ultimately, the web portal will be used to initiate data processing requests by INDOT personnel.

SPR-4741: Leveraging LiDAR Intensity to Evaluate Roadway Pavement Marking Retro-Reflectivity

Principal Investigators Ayman HabibDarcy Bullock
Start Date - 09/01/2022

This proposal aims at investigating the use of LiDAR intensity to evaluate the lane marking reflectivity and allow INDOT to enforce contractor pavement marking warranties with it.


SPR-4739: Sinusoidal Rumble Strips Measures of Effectiveness

Principal Investigators Andrew TarkoMario Romero
Start Date - 08/15/2022

This project will estimate and compare the safety performance of conventional and sinusoidal rumble strips to inform INDOT’s decision of rumble strip design. Edge-line rumble stripes narrower than standard 12” will be checked for safety and warning effectiveness to accommodate pedestrians and bicyclists within existing road shoulders together with stripes.  Crash Modification Factors will be estimated for several types of crashes at three levels of crash severity to help select alternative safety countermeasures including rumble stripes lateral location: centerline only, shoulder only, and centerline plus shoulder.


SPR-4738: Origin-Destination Counts in Weaving Area Utilizing Existing Field Data

Principal Investigators - Stanley Chien (IUPUI), Yaobin Chen (IUPUI), Christopher Lauren (IUPUI)
Start Date - 07/01/2022

Vehicle weaving describes the trajectories of vehicles that change lanes in areas between ramp merge and diverge junctions. Especially during heavy traffic, vehicle weaving will slow traffic, cause congestion, and cause a higher possibility of crashes. The primary goal of this proposed research is to develop an efficient and effective method to quantitatively determine the vehicle weaving at specific highway locations using CCTV cameras. The outcome of this research will provide INDOT with an effective tool to improve the design of vehicle weaving areas for reduced traffic congestion and enhanced safety.

This project was completed as of December 19, 2023. A final report is pending.


SPR-4737: Development of Business Processes to Prioritize Traffic Signal Re-Timing and Assess Impact of Re-Timing Activities

Principal Investigators Darcy Bullock
Start Date - 12/01/2022

INDOT has over 2000 traffic signals. This project will develop a scalable technique for systematically evaluating the performance of these signals to prioritize re-timing and maintenance activities. Results of this project will be more efficient allocation of engineering and maintenance resources to reduce motorist delay and professional development for INDOT engineering staff in the application of the latest tools.

SPR-4736: A Study of Suburban Arterial Safety Performance Based on Median Type

Principal Investigators Andrew TarkoMario Romero
Start Date - 08/15/2022

There is a need for guidance on selecting a proper median type when planning significant work on suburban arterial roadways to properly balance their safety and accessibility. This guidance will be based on the density of local land use, needs for access, traffic volumes, and desired speed limit. Equations, tables, and graphs, whichever most appropriate, will be provided to decide between a two-way left-turn lane and a continuous median with openings and their design.


SPR-4735: Development of Latitude/Longitude (and Route/Milepost) Model for Positioning Traffic Management Cameras

Principal Investigators Ayman HabibDarcy Bullock
Start Date - 09/01/2022

The project will develop a strategy/system for controlling PTZ cameras to identify the best camera location, including its settings, to visualize emerging incidents along transportation corridors that are inferred from connected vehicle data traces.

This project was completed as of January 5, 2024. A final report is pending.


SPR-4734: Expediting and Enhancing the Hydraulic Site Data Collection Process

Principal Investigators Mohammad JahanshahiAyman Habib
Start Date - 01/03/2023

The deliverable of this project will be a report that studies the feasibility of using existing, commercially available off-the-shelf hardware that can be used for contactless estimation on relative elevation.


SPR-4733: Steel Bridge Inspection, Assessment, Repair, and Management under FIRE

Principal Investigators Amit Varma, Akanshu Sharma, Lisa Choe
Start Date - 01/03/2023

The proposed project combines experimental work, material testing, and numerical analysis to develop comprehensive research-based inspection, assessment, and repair guidelines for steel bridges. These guidelines will be implemented in the INDOT Bridge Inspection Manual with the help of the SAC members and other INDOT engineers.


SPR-4732: Development of Guidelines for Use and Design of Deep Foundations for Three-Sided Structures

Principal Investigators Rodrigo SalgadoMonica Prezzi
Start Date - 01/01/2023

The project will develop guidance for how to distribute loads to deep foundations supporting buried three-sided structures and how to design these foundations.


SPR-4731: Feasibility of 3D Scanning Technology for Bridge Inspection and Management

Principal Investigators Jungil Seo, Amit VarmaKyubyung Kang
Start Date - 01/09/2023

The deliverable for this project is an automated framework that can utilize 3D scanned data for assessing the residual capacities of bridge members. The framework can include software developed by the Purdue research team or a set of macros. Additionally, project progress reports will be submitted every six months, and a final project report summarizing the findings at the end of the project.


SPR-4730: Widening Reinforced Concrete Elements using Chemical Anchoring Systems (Post-installed Rebar Systems)

Principal Investigators Akanshu Sharma
Start Date - 12/01/2022

This project investigates the structural behavior of extended bridge slabs using post-installed rebar systems and aims to develop guidelines for the design and construction of widened bridge slabs using post-installed rebar systems.


SPR-4729: Evaluation of the Accuracy of Non-Destructive Testing (NDT) Methods for the Condition Assessment of Bridge Decks and integration of NDT into the Asset Management Program

Principal Investigators Akanshu SharmaSamuel Labi

Start Date - 09/01/2022

This project will study NDT methods to evaluate their accuracy and dependability in assessing the actual condition of bridges decks and reliably detecting anomalies. Recommended processes and guidelines for implementing an NDT-based measure into the state’s bridge asset management program will be developed. This research project is focused on comparing NDT results to actual bridge deck conditions and using the findings to incorporate NDT into the asset management program.


SPR-4728: Stone Matrix Asphalt (SMA) Overlay Performance Evaluation

Principal Investigators - Jusang Lee (INDOT), John Haddock, Mohammadreza Mirzhosseini
Start Date - 01/01/2023

INDOT is experiencing the second round of SMA pavement rehabilitation, which provides an excellent opportunity to quantitatively review SMA performances and evaluate INDOT’s return-on-investment (ROI).


SPR-4727: Practical Implementation of Superabsorbent Polymers for Internally Cured Concrete

Principal Investigators - Kendra ErkJan Olek
Start Date - 01/01/2023

This project will determine practical ways to utilize superabsorbent polymer (SAP) internal curing agents in concrete mixtures composed ofType IL cement and other supplementary cementitious materials, including slag, silica fume, and E5® nanosilica. Evidence-based guidance will be provided on specific implementation strategies, including SAP delivery method, batching sequence, mixing requirements, and external curing needs for SAP-concrete mixtures.


SPR-4724: Detection and Assessment of Sulfates in the Pavement Subgrade

Principal Investigators Antonio BobetMarika Santagata
Start Date - 08/01/2022

The aim of the project is to determine whether detection of sulfates in lime-treated subgrade soils that have been in service for a number of years is the result of false positives from test ITM 510. Detection of sulfates in lime-treated soils is problematic because it requires removal of the soils. This is a costly outcome, given that the subgrade soils have been in service for a number of years and the pavement may not have shown signs of distress. The problem is becoming significant given the number of maintenance and rehabilitation projects that are ongoing or planned.


SPR-4723: Investigate Resilient Modulus Improvements to Bases and Subgrades from Geosynthetic Reinforcement

Principal Investigators - Erol Tutumluer (University of Illinois Urbana-Champaign), Peter Becker (INDOT)
Start Date - 08/16/2022

This research will employ state-of-the-art methods, i.e., automated plate load testing (APLT) and bender element (BE) field sensors to directly measure geosynthetic reinforcement stiffness improvements to base and subgrade layers. Testing results will be used to develop geosynthetic reinforcement design guidelines for INDOT pavement design (e.g., recommended resilient modulus values due to geosynthetic reinforcement and the related mechanically stabilized base course modulus profile with depth, optimum geosynthetic layouts, MEPDG implementation, etc.).


SPR-4720: Autonomous Construction Progress Monitoring and Documentation

Principal Investigators Mohammad Jahanshahi
Start Date - 08/15/2022

This project provides an effective tool for remotely monitoring construction progress and identifying the quality of construction work done by contractors in real-time segment by segment. The deliverable will be a graphical user interface (GUI) where INDOT staff can conveniently open a video file with a list of activities and their timestamps for quick retrieval of video frames corresponding to each activity.


SPR-4718: Influence of Nanomaterials-based Admixtures on the Entrained Air Void System and Freeze-Thaw (FT) Resistance of Concrete

Principal Investigators Jan Olek, Mirian Velay-Lizancos
Start Date - 01/01/2023

This project has following Objectives: (1) evaluate the effect of nanosilica admixtures on the air-void characteristics of concretes used for construction of bridges and bridge deck overlays, (2) examine the influence of the characteristics of the air-void system on the freeze-thaw resistance of concrete, (3) compare the influence of the concrete production method (lab vs. field) on the durability of concrete, (4) examine, in partnership with INDOT’s Division of Materials & Tests, the effect of non-traditional (microsphere type) air entrainment products on the quality of the air-void system in concretes with nanosilica admixtures.


SPR-4717: Assessment of Temperatue Correction Factors for Falling Weight Deflectometer Deflections

Principal Investigators - Seonghwan Cho (INDOT), John Haddock, Bongsuk Park
Start Date - 03/01/2023

This study will develop an enhanced method of temperature correction on the FWD deflections to minimize temperature effects during FWD data analysis. The field investigation and numerical analysis will be conducted to identify the relationship between FWD deflections and testing temperatures. Based on the identified relationship, the FWD temperature correction guidelines will be established.


SPR-4716: Lessening Density Requirement and Adjusting Density Pay Factors for Asphalt Pavements in Poor Sublayer Conditions

Principal Investigators - Jusang Lee (INDOT), Kyubyung Kang
Start Date - 11/01/2022

The main objectives of the study are (1) to identify the correlation between the density of the new surface layer and the condition of existing sublayers of HMA pavements and (2) to make recommendations for adjusting the density pay factor of the INDOT standard specification based on the identified correlation. The study will support the INDOT to make a data-driven density specification change.


SPR-4715: Study on the permissible depth of utilities under the MSE walls and means and methods of protecting the MSE walls when the permissible depth cannot be provided

Principal Investigators Antonio Bobet
Start Date - 01/01/2023

Mechanically Stabilized Earth retaining structures are extensively used by INDOT because of cost, simple design and construction, and low maintenance. The problem of placing utilities within the reinforced volume of soil or under the MSE wall is not well resolved, and the potential consequences of utility failure can be catastrophic. The aim of the project is to provide INDOT with criteria regarding the optimum placement of the utilities and recommendations for their protection and maintenance such that their interaction with the MSE wall does not have detrimental consequences to the performance of the wall structure.


SPR-4714: Use of Machine Learning Methods to Obtain a Reliable Predictive Model for Resilient Modulus of Subgrade Soil

Principal Investigators - Sarah Khoshnevisan (University of Cincinnati), Mehdi Norouzi (University of Cincinnati)
Start Date - 10/01/2022

This research will use machine learning to develop/train data model(s) for predicting the resilient modulus of soil in the state of Indiana. The developed model(s) will reduce the need for routine iterative laboratory testing conducted for obtaining the resilient modulus of soil, which is complicated, resource intensive, time consuming, and expensive. In addition, based on the developed model(s), recommendations will be provided for future sampling locations.


SPR-4713: Development of Guidelines for Compatible Sensor Installation, Data Collection, and Database-based Visualization for INDOT

Principal Investigators James KrogmeierJohn Haddock, Boonam Shin (INDOT)
Start Date - 01/01/2023

This project will develop comprehensive guidelines and example systems for sensor data collection, integration, and analysis to streamline implementation within INDOT’s research division and MIS systems.


SPR-4711: Addressing Accessibility, Equity and Environmental Justice Measures of Infrastructure

Principal Investigators Satish UkkusuriNadia Gkritza
Start Date - 10/15/2022

The project will develop accessibility and equity measures for Indiana that will be visualized for different regions, time periods, and socioeconomic groups of Indiana. This will be achieved by the analysis and modeling of high‐resolution spatiotemporal data pertaining to travelers, land use, and economic opportunities. Based on the analysis we will prepare an equity assessment for the state and develop actionable policy for environmental justice and transportation equity.


SPR-4710: INDOT Project Change Orders – Root Cause and Recommendations

Principal Investigators - Mark HastakSamuel LabiNadia Gkritza
Start Date - 11/01/2022

The research will analyze and document the trends and patterns of change orders associated INDOT projects over a 10-year period, for different project types and at different highway administrative districts. The study will also identify contract types and project types that are more likely to experience a given number of change orders and the total change order cost that can be expected of a given project. Then the research will analyze the impact of change orders on cost overruns and time delay. Finally, a set of recommendations or guidelines will be developed to help INDOT reduce the incidence of change orders.

This project was completed as of April 10, 2024. A final report is pending.


SPR-4706: Electric Vehicles: Public Perceptions, Expectations, and Willingness-to-Pay Across Highway User Groups (Vehicle Classes)

Principal Investigators Nadia GkritzaSatish Ukkusuri
Start Date - 08/15/2022

The main objective of this proposed research is to enhance the current understanding of the perspectives of all users in Indiana (light-duty vehicle drivers, truck drivers etc.) for EVs and obtaining quantitative data for EV demand in Indiana. This will be achieved through survey data analysis, demand generation, and EV trip analysis. The study aims to offer guidance regarding ways to promote EV adoption across highway user groups and planning for policy decisions, charging pricing and schemes.


SPR-4704: Evaluating Robustness of MDSS Forecast and Compliance with Recommendations

Principal Investigators Darcy Bullock
Start Date - 12/01/2022

MDSS forecasts have been used for many years. INDOT also has developed a series of dashboards characterizing road conditions, position of plow trucks, and application rates. This project will conduct a systematic unit-by-unit evaluation on how close the units follow MDSS forecasts (application rates, deployment times) and the corresponding road conditions. After action reviews to see how close MDSS came to forecasting location, severity, and timing of winter events will also be conducted.


SPR-4702: Autonomous Mower Pilot Project

Principal Investigators - John Evans, Gregory Shaver
Start Date - 08/01/2022

This project will help INDOT take initial steps to autonomous roadside mowing by achieving the following three main objectives: 1) Collection of machine data using current machines with human operators. 2) Autonomous algorithm generation and virtual simulation. 3) Physical algorithm validation on an autonomous trimming platform.


SPR-4701: Implementation of Heavy Fleet Routes and Facilities Locations Optimization

Principal Investigators Steven Dunlop, Thomas Brady
Start Date - 11/15/2022

The DCMME center at the Krannert School of Management will develop a comprehensive what‐if testbed to enable rapid analytic and economic evaluation for current and future location analysis and optimal longterm clean sheet, economic facility development planned by INDOT concerning optimal snow removal.


SPR-4646: Advancing INDOT's Friction Test Program for Seamless Coverage of System

Principal Investigators Yi Jiang, Shuo Li (INDOT)
Start Date - 01/01/2022

Pavement friction is one of the main factors affecting roadway safety. The current INDOT’s friction test program needs to be enhanced to include the polish-prone spots such as horizontal curves and highway sections with steep grades. In addition, the INDOT R&D Division has increasingly received requests for friction testing on pavement markings at crash sites such as two-lane rural highways and intersections over the past few years. However, no standard method or practice is currently widely accepted for testing and evaluating the friction performance of pavement markings nationwide. Color surface treatment (CST) (i.e., colored pavement) is increasingly used within bus and bike lanes to increase the visibility of the facilities and reduce unauthorized lane uses. CST is also anticipated to enhance safety through durable friction performance under frequent bus braking and acceleration. This study is proposed to address above issues related to friction testing and improve highway safety.

This project was completed as of March 14, 2024. A final report is pending.


SPR-4640: Geometric Constraints and Visual Field Related to Speed Management

Principal Investigators - Renran Tian (IUPUI), Yaobin Chen (IUPUI), Vincent Duffy
Start Date - 01/01/2022

The project deliverables will provide insights of how visual fields and optical cues affect perceived risks, speed perceptions, and driving speed, in different road locations. Based on the research outputs, cost-efficient road scene augmentation means that plants/shrubs, dividers, markings, overhead frames, or others will be designed. The strategy to implement certain levels of visual field restriction and types of optical cues at different locations will be discussed between the TASI research team and INDOT.

This project was completed as of March 22, 2024. A final report is pending.


SPR-4636: Research Support to INDOT on I-465 Southeast Variable Speed Limit and Ramp Meter Project

Principal Investigators Darcy Bullock
Start Date - 07/01/2021

This project will develop analysis techniques and performance measures for the variable speed limit (VSL) and ramp meter deployment for I-465 on the southeast side of Indianapolis. These performance measures will be used to provide agile adjustments to the VSL deployments and inform the agency on expected benefits in future deployments on urban freeways elsewhere in the state.


SPR-4635: New Repair Strategies for Life-Cycle Extension Corroded Steel Girder Bridges

Principal Investigators Amit VarmaRobert Connor
Start Date - 09/01/2021

This project collaborates and builds upon ongoing project SPR-4527 on the “Strength of Corroded Steel Beam Bridges and Effects on Load Rating.” Decommissioned corroded steel girder bridges obtained from the North-Split Reconstruction project will be shared between the proposed project and SPR 4527. It is important to note that SPR 4527 focuses only on the strength and load rating of corroded steel girder bridges, not their rapid repair or life-cycle extension.


SPR-4631: Evaluation of the Potential Benefits of Implementing the AASHTO Guide Specification for the Analysis and Identification of Fracture Critical Members and System Redundant Members

Principal Investigators - Robert Connor, Cem Korkmaz, Amit Varma
Start Date - 08/01/2021

In 2018, The AASHTO Committee on Bridges and Structures (COBS) approved the AASHTO Guide Specifications for the Analysis and Identification of Fracture Critical Members and System Redundant Members and the AASHTO Guide Specifications for Internal Redundancy of Mechanically-fastened Built-up Steel Members. This project will conduct an exploratory study on a set of bridges in the state of Indiana where both the IRM and SRM Guide Specifications are evaluated for implementation within the state.

This project was completed as of April 4, 2024. A final report is pending.


SPR-4630: Implementation Exploration of Autonomous Vehicles: Impacts of Autonomous Truck-Mounted Attenuator (ATMA) on INDOT Work Zone Safety, Mobility, and Crews; Perception/Behavior/Productivitiy

Principal Investigators Yunfeng ChenJiansong Zhang, Yiheng Feng
Start Date - 07/26/2021

Utilization of ATMA is believed to protect crews and drivers from crashes caused by reckless and distracted drivers. This study will develop a tailored ATMA plan based on observations from existing TMA operations, INDOT crews’ perception of ATMA and characteristics of ATMA’s operation environment in Indiana. The project will evaluate the ATMA in field tests and provide recommendations for implementation.


SPR-4629: Implementation and Assessment of Work Zone Intrusion Technologies

Principal Investigators Sogan Hasanzadeh
Start Date - 07/01/2021

To assist INDOT with enhancing the safety of motorists and workers in construction work zones on high-speed roadways, this study aims to provide INDOT work zone safety committee with guidance on selection, assessment and implementation of workzone intrusion technologies. The proposed research will include comprehensive and accurate information about innovative technologies to improve safety in work zones (guidebook, training, and strategies).

This project was completed as of February 27, 2024. A final report is pending.


SPR-4628: Exploration of Color Patterns for Improving Work Zone Safety and Perception

Principal Investigators Yunfeng ChenJames JenkinsJiansong Zhang
Start Date - 08/23/2021

INDOT had 5,470 collisions every year on average between 2015 and 2019, with many occurring in Indiana work zones and causing significant loss to both construction workers and vehicle drivers. This study will identify identify color-related root causes of accidents at Indiana work zones, propose solutions (e.g., different color schemes to better convey information), and improve INDOT employees’ health and safety.


SPR-4623: Improved Light Weight Deflectometer Test (LVD) and Analysis

Principal Investigators - Boonam Shin (INDOT), Peter Becker (INDOT), Antonio Bobet
Start Date - 03/01/2022

This project aims to establish a specialized testing program for the determination of maximum LWD deflection criteria in lieu of field test sections. The deliverables are: (1) Laboratory LWD equipment, which will be integrated into the INDOT Division of Research & Development (R&D) specialized testing program; (2) A manual of standard procedures for operating and calibrating the laboratory LWD equipment; and (3) An addendum to the manual of laboratory LWD standard operation and calibration procedures that specifies standard procedures for the interpretation and analysis of laboratory LWD test data.


SPR-4622:  Integration of BIM for Bridge Modeling

Principal Investigators Jiansong ZhangYunfeng Chen, Hazar Nicholas Dib
Start Date - 09/01/2021

This project will create a technology‐process guideline for integrating BIM into the design, construction, and asset management workflow based on the PDF2BIM tool and BIM maturity model roadmap.


SPR-4620: Developing AI-assisted In-situ NDT Method for Air-Void Distribution Testing in Fresh and hardened Concrete

Principal Investigators Na (Luna) Lu, Guang Lin
Start Date - 09/1/2021

This project will develop a field-deployable NDT method to evaluate the air void distribution in fresh and hardened concrete. The benefits of this program include 1) improving concrete pavement quality and long-term durability; 2) avoiding poor concrete quality and related materials, in-house labor and equipment cost; and 3) avoiding over design, and lower construction and maintenance cost.

This project was completed as of April 1, 2024. A final report is pending.


SPR-4619:  Back-calculated Dynamic Modulus Master Curve from the Time Histories of Falling Weight Deflectometer Surface Deflections

Principal Investigators - Seonghwan Cho (INDOT), John Haddock
Start Date - 09/01/2021

The analysis of deflection data collected by the FWD provides a quick and reliable way of characterizing the properties of the asphalt layers as well as assessing the load-carrying capacity of existing pavement structures. This research will provide the back-calculation methodology of the |E*| master curve for the asphalt pavement layer using the time histories of FWD surface deflections and layered viscoelastic forward algorithms in an iterative dynamic back-calculation procedure.


SPR-4617: Demonstration of Zero Speed Inertial Profilers

Principal Investigators - Dwayne Harris (INDOT)
Start Date - 03/01/2022

INDOT pavement smoothness specifications utilize inertial profilers and IRI to evaluate newly constructed concrete pavement. The utilization of current inertial profilers is limited in low-speed zones that include stop signs and traffic lights.  Currently, one vendor is producing a “Zero Speed” inertial profiler, and the two other major players in inertial profilers are developing Zero speed inertial profilers. The “Zero Speed” inertial profilers include additional hardware and updated software to better model the motion of the vehicle.  This allows collecting more accurate profiles in urban areas that include stop signs and traffic lights. The purpose of this study is to demonstrate the utility of “Zero Speed” inertial profiler in urban areas.


SPR-4608:  Forecasting Shifts in Hoosiers' Travel Demand and Behavior

Principal Investigators Nadia Gkritza, Satish Ukkusuri, Hua Cai, Ananth Iyer
Start Date - 10/01/2021

This project will develop long term future forecasts of transportation demand conditions for people and freight— both conventional and micro-freight package delivery in Indiana.  The results of this study will enable the agency to properly adjust its business practices, planning models/applications (e.g., Statewide Travel Demand Model or traffic microsimulation), and investment decisions to best serve those future conditions; and to carry out long-range scenario planning.

This project was completed as of November 30, 2023. A final report is pending.


SPR-4607:  Full-scale Dynamic Wireless Power Transfer and Pilot Project Implementation

Principal Investigators John HaddockNadia GkritzaDionysios AliprantisSteven Pekarek
Start Date - 07/01/2021

The objectives of this project are: i) develop a better understanding of pavement/ dynamic wireless power transfer (DWPT) system interaction, including DWPT reaction to environment and traffic loads and pavement materials responses to operational DWPT; and ii) support the design and installation of a 215 kW DWPT system pilot for heavy-duty vehicles on an existing INDOT roadway. The pilot project will help develop construction techniques and provide a real-world testbed for optimizing the pavement/DWPT system. 

This project was completed as of March 28, 2024. A final report is pending.


SPR-4606: Overweight Divisible Loads: Permit Administration and Impact on Indiana’s Road Infrastructure and Safety

Principal Investigators Samuel LabiSteven DunlopKumares Sinha
Start Date - 06/07/2021

The study will provide information to INDOT to support deliverables to the legislature. It will also determine the actual infrastructure performance at permitted routes; and identify any need to revise
permit fees to incentivize user behavior. The study will measure the anticipated changes in infrastructure consumption due to any fee changes, document impacts of fee structures on shippers, and explore financial levers to facilitate permitting. Deliverables will include a permit Calculator (for carriers) to calculate benefits of axle addition, and a dashboard (for INDOT) to monitor permitting impacts. Finally, carriers will be surveyed for their perspectives and possible responses to future OW-permitting initiatives.

SPR-4605: Automated Record Keeping for Maintenance Operations via Tracking of Maintenance Vehicles using Telematics Tracks

Principal Investigators James Krogmeier
Start Date - 01/01/2022

INDOT is currently working with Parsons to deploy telematics devices in fleet vehicles. These devices can integrate vehicle sensor data from CANbus and other means with GPS positions and time to create a record of vehicle activity, which may be synchronized to the cloud in real time. With this new capability there is need to use the new data to automate the provision of management insights and to create visualizations and dashboards to serve the results inside of INDOT. This proposal will do this in the context of important summer maintenance activities such as pavement patching.


SPR-4604: Demonstration of Infrared Heating System for Mitigation of Positive Elevation Change Areas of Localized Roughness (Bumps) in HMA

Principal Investigators - Dwayne Harris (INDOT)
Start Date - 12/01/2021

The primary purpose of this research is to demonstrate the process of utilizing infrared technology to mitigate bumps in HMA/composite pavements. An infrared pavement heating system consisting of a self contained maintenance trailer, capable of transporting heating equipment, infrared heating array, compaction equipment and hand tools will be purchased. It is anticipated that procurement of the complete system will increase the efficiency over needing multiple vehicles and systems to convey makeup HMA material and compaction equipment separately.


SPR-4601: Field Handbook for Maintenance and Preservation Treatments of Concrete Pavements

Principal Investigators Dulcy AbrahamJan Olek
Start Date - 01/15/2022

This project will compile concrete maintenance standard practices from relevant State Transportation Agencies (including INDOT).  The primary deliverable of this project will be an easily accessible and comprehensive field manual for concrete maintenance standard practices for use by INDOT Technical Services and by personnel in the scoping, maintenance, design, and construction departments at INDOT.

This project was completed as of February 14, 2024. A final report is pending.


SPR-4549: Salt Monitoring and Reporting Technology (SMART): Development of a Photogrammetric System for Salt Inventory Reporting

Principal Investigators Ayman HabibDarcy Bullock
Start Date - 02/01/2021

Salt is an expensive commodity that is critical for successful winter operation. This project proposes the development of a stationary multi-camera photogrammetric system for salt inventory (volume estimation and reporting) in an indoor environment – specifically, dome-like and rectangular storage facilities.

This project was completed as of August 29, 2023. A final report is pending.


 

SPR-4547: Data Interpretation of Automated Plate Load Test (APLT) for Realtime, In Situ Determination of Unbound Layer Resilient Modulus

Principal Investigators - Peter Becker (INDOT), Marika SantagataPhilippe Bourdeau
Start Date - 01/01/2021

Findings from this study will inform both pavement design and pavement quality assurance processes for INDOT. ALPT measurements of aggregates and subgrades will yield high-quality, in situ resilient modulus measurements that can validate (or refute) current INDOT pavement design assumptions. Refined resilient modulus inputs can be incorporated into INDOT pavement design upon completion of the study.

This project was completed as of Augsut 30, 2023. A final report is pending.


SPR-4541: Roadside Barrier End Treatments: Safety Evaluation of INDOT Inventory and Practices

Principal Investigators Andrew TarkoMario Romero
Start Date - 07/01/2020

This project will establish a basis for state-specific end treatment selection guidelines applicable to various traffic and road conditions: speed, motor vehicle volume, presence of heavy trucks and motorcycles, available space, barrier end location. The guidelines will promote most effective solutions while reducing the number of treatment types to improve their maintenance. The cost effectiveness will consider the reduction in crash severity and frequency and the cost of end treatment alternatives within the life cycle analysis for new installation or for replacement of existing ones.

This project was completed as of February 24, 2023. A final report is pending.


SPR-4540: Incorporating Time Dependent Date to Pro-Active Safety Management - A Pilot Study

Principal Investigators Andrew TarkoMario Romero
Start Date - 07/01/2020

The current reactive safety-related decision making is based on crash data collected for at least three years. The existing road data supplemented with emerging data that reflect temporal changes in safety factors such as volume, speed, weather, and pavement conditions are expected to be useful in estimating hourly risks of crashes and their severity. The project will demonstrate the development and proactive use of new safety management system components for freeway rural segments and urban intersections. The results will include the guidelines of acquiring, storing, and handling massive amount of data needed for this purpose.

This project was completed as of December 18, 2023. A final report is pending.


SPR-4535: Development of a Formalized Program for In-service Inspection of Pedestrian Bridges

Principal Investigators Robert Connor
Start Date - 01/01/2021

Many pedestrian bridges are complex structures and may utilize non-redundant cable supported walkways, curved super structures, and materials not commonly used in highway bridges. Some of these bridges are over busy state highways and carry many pedestrians daily. The absence of any state-wide uniform inspection requirements elevates the risk associated with such bridges. This research project addresses the issues related to in-service inspection needs associated with pedestrian bridges.


 

SPR-4521: Comprehensive Pavement Patching Tools and Web-based Software for Pavement Condition Assessment and Visualization

Principal Investigators James Krogmeier, Seonghwan Cho (INDOT), John Haddock
Start Date - 08/01/2020

The project will develop guidelines for concrete patching slab removal and creation of patching interface in full depth HMA patching. In addition, the project will implement in MATLAB and Python an algorithm that incorporates data from FWD, GPR, and 3D to produce patching tables with the required patching depth as an output. Finally, the project will deliver web server software needed for visualization of the patching table including the data sources (FWD, 3D image, and GPR) used in its creation.


SPR-4518: Review of Indiana Asphalt Binders (In-Situ PG Grade Asphalt Determination)

Principal Investigators - Jusang Lee (INDOT), John Haddock
Start Date - 08/15/2020

The study objectives are:   (1) evaluate performance graded binder selections using LTPPBind, version 3.1; (2) to explore additional low-temperature binder grades;  (3) to determine if as-constructed asphalt binder grades meet project specifications; and (4) to develop a draft asphalt binder specification that can cost-effectively improve Indiana’s asphalt pavement cracking performance.

This project was completed as of January 17, 2024. A final report is pending.


SPR-4517: Field Drainage Evaluation Test on I-69 Added Travel Lanes in Indiana

Principal Investigators - Boonam Shin (INDOT), Jusang Lee (INDOT), John Haddock
Start Date - 01/01/2020

INDOT implemented the application of advanced subsurface drainage systems on the I-69 added travel lanes near Anderson, IN. Evaluation of the drainage systems constructed in the test strips is needed.  Optimized field drainage evaluation methods and comprehensive analysis-visualization tools with advanced data analysis techniques and software will be provided through this study.


SPR-4514: Material Characterization and Determination of MEPDG Input Parameters for Indiana Superpave 5 Asphalt Mixtures

Principal Investigators -  Seonghwan Cho (INDOT), John Haddock, Peyhaneh Rahbar-Rastegar
Start Date - 07/01/2020

The objective of the study is to determine the necessary PavementME input parameters for Superpave 5-designed asphalt mixtures. The anticipated performance of Superpave 5 asphalt mixtures compared to conventional Superpave mixtures will be evaluated using the software to characterize the possible long-term performance enhancements of using Superpave 5 asphalt mixtures. The findings will provide guidance for modifying the PavementME aging prediction model for Superpave 5- designed mixtures.

This project was completed as of February 9, 2024. A final report is pending.


SPR-4450: Visualization of Falling Weight Deflectometer (FWD) Data and Road Imagery for Enhanced Pavement Assessment

Principal Investigators Mohammad Jahanshahi
Start Date - 01/13/2020

INDOT conducts FWD testing to assess the structural capacity of road pavements. A human inspector goes through the collected data, which is linked with GPS information, and decides about an appropriate followup action. However, a nonpictorial evaluation as such is not ideal for locating a critical area with reference to its immediate vicinity and areal conversance of the INDOT personnel. To address this shortcoming in the standard operating procedure, we propose to develop an application and a visualization tool for FWD data by integrating it with Google Maps and image data recorded by cameras.


SPR-4443: Remaining Service Life Prediction of Indiana Pavements Using Mechanistic Methods

Principal Investigators -  Seonghwan Cho (INDOT), John Haddock
Start Date - 02/01/2020

The study objective is to predict pavement remaining service life in terms of major pavement distresses using FWD and IRI data. These data, combined with laboratory test results, will be used to develop deterioration curves for flexible, rigid, and composite pavements across Indiana climatic zones. Such curves can be used to provide recommendations on required rehabilitation or reconstruction.


SPR-4431: A New Approach to Accelerated Fabrication of Steel Bridges: Design, Optimization, and Demonstration

Principal Investigators -  Ashley Thrall (University of Notre Dame)
Start Date - 01/01/2020

This project will develop and demonstrate a new approach to the accelerated fabrication of resilient steel bridges. Research objectives include: (1) Design and build a simply-supported and a multi-span continuous demonstration bridge; (2) Measure the dead and live load strains of the demonstration bridges as experimental evidence demonstrating behavior; and (3) Develop and optimize a kit-of-parts system to facilitate adoption.


SPR-4332: Performance Related Specification for Pavement Milling

Principal Investigators - Seonghwan Cho (INDOT), John Haddock
Start Date - 01/01/2019

The objective of this research is to evaluate pavement damage that could occur during milling process. The primary deliverable for this research will be a technical report documenting more reliable milling procedures and specifications, testing methodologies, testing results, and findings.


SPR-4329: Verification Testing of MSE Wall Foundation Bearing Capacity Based on the DCPT

Principal Investigators - Peter Becker (INDOT), Monica Prezzi, Rodrigo Salgado
Start Date - 08/15/2019

This project aims to develop: i) guidelines on how best to conduct and interpret subsurface investigations for proposed MSE walls, particularly for road widening projects; ii) methodology to estimate the bearing capacity of foundation soils found in Indiana in MSE wall construction and iii) guidelines on how to use quality assurance methods for verifying MSE wall foundation shear strength and bearing capacity to prevent serviceability limit states from being reached. Two MSE walls will be instrumented and monitored in the context of this project.


SPR-4327: Development of Compaction Control Guidelines for Aggregate Drainage Layers and Evaluation of In Situ Permeability Testing Methods for Aggregates

Principal Investigators - Peter Becker (INDOT), Marika SantagataPhilippe Bourdeau
Start Date - 01/01/2019

Objective of this research is to improve the process for aggregate drainage layer construction within INDOT contracts. Results of the study will allow INDOT to move towards standardizing a performance based quality assurance approach for aggregate drainage layer construction.


SPR-4234: Weigh in Motion Implementation and Data Quality Control for Asset Damage Reduction

Principal Investigators - Darcy Bullock, James Handy
Start Date - 04/01/2018

This project has two components. 1) Developing a shared vision among INDOT, ISP, and DOR on the business processes and agency interaction required for implementation of WIM based enforcement. The Purdue Technical Assistance Program (TAP) will lead that initiative.  2) The Purdue Traffic Lab will characterize the WIM accuracy of a newly constructed site on I-70 to define expected weight tolerances, routine calibration requirements, and recommend changes to INDOT’s current WIM construction specification. 


 

SPR-4153: INDOT Highway Lighting Support Services

Principal Investigators - Robert Kramer
Start Date - 12/01/2016

This project will provide technical support, testing services, and analysis regarding the design and options for the implementation of LED and other solid state based highway lighting. The Energy Efficiency and Reliability Center (EERC) will support development of the testing and evaluation program. A written report of results will be provided upon completion of field testing.


SPR-3902: Performance Acceptance and Performance Monitoring of Pavement Using Falling Weight Deflectormer (FWD) and International Roughness Index (IRI)

Principal Investigators - Tommy Nantung (INDOT), Hyonho Chun, Richard Ji (INDOT)
Start Date - 01/01/2015

The objectives of this research project are geared toward determining a practical solution in INDOT pavement acceptable structural performance limits and to construct pavement structural performance curves/models for scoping, design, and preservation purposes. The ultimate goal of the research is to review the structural and functional performance of selected pavement sections and provide the Department with better practical tools for pavement engineers during scoping, design, construction, and maintenance processes.