[BNC-all] BNC E-news for the week of February 24th

Turner, Jaime J jjbiggs at purdue.edu
Mon Feb 24 13:56:30 EST 2020


[cid:image001.jpg at 01D4EDE9.DE5D5B10]



Seminars /Workshops / Events



PQSEI Seminar: Gerard (Rod) Rinkus<https://www.purdue.edu/discoverypark/events/index.php?view=2410>

February 24th, 3:30pm in BRK 1001

Representing Probabilities as Sets instead of Numbers Allows Classical Realization of Quantum Computing



PQSEI Seminar: Julian (Jay) Hook<https://www.purdue.edu/discoverypark/events/index.php?view=2495>

February 25th, 3:30pm in UNIV 119

Music as a Mathematician's Playground



Purdue Engineering Distinguished Lecture Series: William E. Moerner<https://engineering.purdue.edu/BME/AboutUs/News/2020/moernerlecture>

Harry S. Mosher Professor of Chemistry and Professor by courtesy of Applied Physics, Stanford University

Feb. 26th, 9:30am - 10:30am in MJIS 1001

Single Molecules and 3D Super-Resolution, 3D Tracking, and Cryo-CLEM in Cells

Panel Discussion: Frontiers of Optical Microscopy for Human Health

Feb. 26th, 10:45am - 11:45am in MJIS 2001



Discovery Park Distinguished Lecturer: Moira Gunn<https://www.purdue.edu/discoverypark/birck/events/index.php?view=2673>

March 26th, 10:30am - 11:30am in MRGN 121

The Challenge for Science in the Global Media



2nd Annual Science Communication Shark Tank Competition<https://www.purdue.edu/discoverypark/birck/events/index.php?view=2561>

March 26th,  5:30pm - 7:30pm in MRGN 121



BNC Seminar: Chris Leighton<https://www.purdue.edu/discoverypark/birck/events/index.php?view=2582>

April 6th, 1:30pm in BRK 1001

Electrolyte Gating of Functional Materials


Birck Events<https://www.purdue.edu/discoverypark/birck/events/index.php> and Birck News<https://www.purdue.edu/discoverypark/birck/news/index.php>




BNC Research Equipment Power Outage for ALL GENERAL LABORATORY, SUBFAB AND CLEANROOM: WED., MAY 6TH 2020 FROM 10AM - 2PM



This is advance notice about major electrical power outage involving all research equipment in the center on Wednesday May 6 from 10AM to 2 PM.  Physical Facilities High Voltage Department have firmed up plans necessary to gain access and have parts needed to fix the switchboard #1 that supplies power to all research equipment in the center.  This involves all research equipment in ALL GENERAL LABORATORY, SUB FAB, AND  CLEANROOM.  All research equipment connected to our building wide Uninterrupted Power Supply (UPS) or generator power will NOT lose power during this time.



This work will be completed during our normal spring building preventative maintenance closure that is scheduled from Monday May 4 through Friday May 8, 2020.  More details on the preventative maintenance closure will be communicated as we get closer to May 4, 2020.



Please contact me if you have any questions or concerns.



Best Regards,



Mark Voorhis

Building Manager

Birck Nanotechnology Center
Office: (765) 494-3036

Interruption to Cleanroom Humidity Control

Dear BNC Cleanroom Users,

On Wednesday February 26, 2020 starting at 7:30AM Purdue Physical Facility Department needs to shut down the medium pressure steam to the cleanroom humidification units for about 8 hours to make needed steam piping modification.

If the outside weather is below normal conditions the cleanroom relative  humidity levels can drop to 10% to 15% (normal humidity level is 45%), which will substantially increase electrostatic discharge when handling electronics devices in the cleanroom.

Please contact me if you have any questions, and thank you for your patience during this interruption.

Best Regards,

Mark Voorhis
Building Manager


Re-Use Bouffant cap and shoe covers

We have been notified by our supplier that until further notice they will not supply shoe covers or bouffant caps. This is in part due to the corona virus by production of these goods and increased need in the medical field.



We are looking into possible alternatives but until thing change please re-use bouffant caps and shoe covers for at least 1 week when entering the cleanroom.



Stephen Jurss

Birck Safety Officer



Follow us on Facebook and Twitter

[Facebook icon]<https://www.facebook.com/nano.purdue.edu/>    [Twitter icon] <https://twitter.com/BNCPurdue>


***If you would like to share a Thank You/Kudos for a Birck staff, student or faculty who went above and beyond in the weekly news and atrium TV's please send to jjturner at purdue.edu<mailto:jjturner at purdue.edu> ***
***If you have any news items (published papers, research news, awards, honors) please send to jjturner at purdue.edu<mailto:jjturner at purdue.edu> so they may be included on Birck's website, Facebook and Twitter pages***

Jaime Turner
Administrative Assistant to the Director
Birck Nanotechnology Center | Room 1027 | W. Lafayette, IN
Office:  765.494.3509 | Fax: 765.496.8383 | Email: jjturner at purdue.edu<mailto:jjturner at purdue.edu>

[facebook image]<https://www.facebook.com/nano.purdue.edu/>   [twitter image] <https://twitter.com/BNCPurdue>
______________________________________________________________

[https://www.purdue.edu/brand/images/Purdue_University-150_Years_of_Giant_Leaps.png]
www.purdue.edu/giantleaps<http://www.purdue.edu/giantleaps>






-------------- next part --------------
An HTML attachment was scrubbed...
URL: </ECN/mailman/archives/bnc-all/attachments/20200224/bdaaf5de/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image004.png
Type: image/png
Size: 197 bytes
Desc: image004.png
URL: </ECN/mailman/archives/bnc-all/attachments/20200224/bdaaf5de/attachment-0004.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 5410 bytes
Desc: image001.jpg
URL: </ECN/mailman/archives/bnc-all/attachments/20200224/bdaaf5de/attachment-0003.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image008.jpg
Type: image/jpeg
Size: 1139 bytes
Desc: image008.jpg
URL: </ECN/mailman/archives/bnc-all/attachments/20200224/bdaaf5de/attachment-0004.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image009.jpg
Type: image/jpeg
Size: 1040 bytes
Desc: image009.jpg
URL: </ECN/mailman/archives/bnc-all/attachments/20200224/bdaaf5de/attachment-0005.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image006.png
Type: image/png
Size: 534 bytes
Desc: image006.png
URL: </ECN/mailman/archives/bnc-all/attachments/20200224/bdaaf5de/attachment-0005.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image007.png
Type: image/png
Size: 597 bytes
Desc: image007.png
URL: </ECN/mailman/archives/bnc-all/attachments/20200224/bdaaf5de/attachment-0006.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image011.png
Type: image/png
Size: 11196 bytes
Desc: image011.png
URL: </ECN/mailman/archives/bnc-all/attachments/20200224/bdaaf5de/attachment-0007.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: NOTICE_ Switchboard 1 Electrical Shutdown_May 6_2020.pdf
Type: application/pdf
Size: 171459 bytes
Desc: NOTICE_ Switchboard 1 Electrical Shutdown_May 6_2020.pdf
URL: </ECN/mailman/archives/bnc-all/attachments/20200224/bdaaf5de/attachment-0001.pdf>


More information about the BNC-all mailing list