[BNC-all] BNC E-news for the week of May 6th

Turner, Jaime J jjbiggs at purdue.edu
Fri May 3 13:59:05 EDT 2019


[cid:image001.jpg at 01D4EDE9.DE5D5B10]



Seminars /Workshops / Events



XPS Lite Workshop Introduction to CasaXPS<https://www.purdue.edu/discoverypark/birck/events/index.php?view=2051>

May 9 - May 10, BRK 1001



Dr. Franco Wong Seminar

Quantum-enabled sensing and secure communications<https://www.purdue.edu/discoverypark/birck/events/index.php?view=2084>

May 17, 2019 @ 1:00pm in BRK 2001


Birck Events<https://www.purdue.edu/discoverypark/birck/events/index.php?view=1835> and Birck News<https://www.purdue.edu/discoverypark/birck/news/index.php>



Birck Nanotechnology Center Closure from June10, 2019 @ 7am to June 18, 2019 @ 4pm


The Birck Nanotechnology Center will be undergoing a closure involving major electrical repairs, chemical exhaust modification, and completion of our semi-annual preventive maintenance from June 10 through June 18, 2018.



Three major tasks will happen during this closure. 1) Required repair of our 3000 amp building power feed that failed on February 3 requiring a shutdown of all building HVAC systems, anticipated to last 2-3 hours to repair.  2) A capital project integration of the cleanroom chemical exhaust system involves cutting into the cleanroom chemical exhaust in four locations to connect 20,000 CFM exhaust system involving a complete rebalance of the cleanroom static pressure, anticipated to last 3-5 days. 3) Finally complete the normal spring preventive maintenance activities, anticipated to last 2-3 days.



Air handling systems, exhaust systems, toxic gas delivery, and monitoring systems will be down beginning at 7 a.m. Monday, June 10 through 4 p.m. Tuesday, June 18.  The BNC staff will be performing appropriate preventive maintenance on the process equipment at this time as well.



All CLEANROOM research work will be suspended until repairs and modification activities are completed and all systems are returned to normal.  Only authorized personnel will be allowed to enter the cleanroom during this time period.



In addition, the laboratory areas will also be affected by this systems maintenance.  As such, all LABORATORY activities that involve exhausted hoods, vacuum systems, and/or toxic gas systems will be down beginning 7 a.m. Monday, June 10 through 4 p.m. Tuesday, June 18.  However, work that involves taking standard electrical measurements may be carried out in the LABS provided that fluctuating air temperature and humidity do not affect the readings.  No chemical work will be allowed during this period.



It is anticipated that the building and process tool maintenance will be completed by the end of the day on Tuesday, June 18.  Please check iLabs for equipment status and availability.



For long term research planning please refer the following future dates for our future preventive maintenance closures.

                                                Week of Oct 14, 2019      Spring  May 4, 2020



Thank you for your cooperation and understanding during these important closures.  Please contact me if you need more detailed information.

Mark Voorhis

Building Manager

Birck Nanotechnology Center

Birck Nanotechnology Center Fire Alarm Testing

May 9, 2019 From 5AM to 7AM

The Birck Nanotechnology Center will be performing fire alarm tests on May 9, 2019 from 5AM to 7AM.

Due to Sub Fab construction changes Purdue Fire Equipment Services (FES) will need to complete a building wide fire alarm testing.  This will involve all fire horns sounding and strobe lights flashing as if we were having a fire alarm.

On May 9, 2019 at 5AM FES will make 2 announcements over the building wide public address system informing everyone in the center about the fire testing and not to evacuate the building.  One announcement will be made 5 minutes before fire testing begins and a second announcement just before activating all fire horns and strobes.

Once the fire test is complete then a final announcement will be made over the building wide public address system informing everyone that the fire alarm testing is complete and to evacuate the building on future alarms.
EM Core

Dear BNC Community, the EM core at Birck will be merging with other EM cores on campus to form the Purdue EM Super Core. As part of the transition, in a couple of weeks, will be moving all content from Birck EM iLab to the Purdue EM iLab website:



https://purdue.ilabsolutions.com/sc/3985/purdue-electron-microscopy-facility/?tab=equipment



Please use the link above to make reservations, training and services request.



Also, the new state-of-the-art microscopes at Birck are online. More information will be posted on the Birck website as well as on the iLab Purdue EM Facility, however the new systems are the Themis Z Aberration Corrected Monochromated S/TEM with EDX and EELS capabilities, the Helios G4 Dual Beam SEM/FIB with EDX capabilities, and the Apreos SEM in the cleanroom. We will be starting training on May 6th for all systems. Please go onto iLab and request the necessary training to get you in the system queue.



Best,



Rosa E Diaz

EM Research Scientist, BNC
-------------- next part --------------
An HTML attachment was scrubbed...
URL: </ECN/mailman/archives/bnc-all/attachments/20190503/cc769073/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image004.png
Type: image/png
Size: 197 bytes
Desc: image004.png
URL: </ECN/mailman/archives/bnc-all/attachments/20190503/cc769073/attachment-0001.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 5410 bytes
Desc: image001.jpg
URL: </ECN/mailman/archives/bnc-all/attachments/20190503/cc769073/attachment-0001.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Preventive Maintenance Shutdown Notice June 10 - June 18 2019 BNC Sign.pdf
Type: application/pdf
Size: 133975 bytes
Desc: Preventive Maintenance Shutdown Notice June 10 - June 18 2019 BNC Sign.pdf
URL: </ECN/mailman/archives/bnc-all/attachments/20190503/cc769073/attachment-0001.pdf>


More information about the BNC-all mailing list