Cleanroom Cameras

The camera server that controls the cleanroom cameras has had a problem for some time now.  We tried to repair the server unsuccessfully, and we have tried to redeploy a different server without success.  Our next step is to procure a new server with new camera software and re-initialize the complete system.  Our engineer Jerry Shepard is leading this project and we anticipate this to conclude sometime this summer.  We will keep the user community updated as we make progress.



Room Changes



In order to accommodate Nano Days several meetings had to be moved to different locations. All the times are the same but please note the new room and building.



Prof. Garimella Group Meeting - April 13 moved from BRK 1001 to MRGN 129

MicroICE Meeting - April 13 - moved from BRK 1099 to BRK 2290

Birck Orientation - April 14 - moved from BRK 1099 to BRK 2290

INDEX - April 14 - moved from BRK 1099 to BRK 1024

Prof. Qi Group Meeting - April 14 - moved from BRK 1201 to BRK 1290

Prof. Shakouri Group Meeting - April 14 - moved from BRK 1201 to BRK 2024

Prof. Shalaev Group Meeting - April 15 - moved from BRK 2001 to MANN 203

Yuchen Du Preliminary Exam - April 15 - moved from BRK 2001 to MRGN 206

Prof. Peroulis Group Meeting - April 15 - moved from BRK 2001 to MRGN 206

iLab Implementation Team - April 15 - moved from BRK 1001 to MRGN 206

Prof. Savran Group Meeting - April 15 - moved from BRK 1001 to DLRC 143A

SMART Film Meeting - April 15 - moved from BRK 1001 to DLRC 143A



Seminar
Takhee Lee
Department of Physics and Astronomy, Seoul National University, Seoul 08826, Korea
Currently on sabbatical at University of California, Berkeley

Interface and surface control of 2D MoS2-based nanoelectronic devices

Thursday, April 21st at 2:00 pm in Birck 2001

For more information please visit: https://nanohub.org/groups/bnc/calendar/details/1450





Shut Down Notice


The Birck Nanotechnology Center will be undergoing a semi-annual preventive maintenance and service shutdown May 2 through May 6, 2016.  Air handling systems, exhaust systems, hazardous gas delivery, and monitoring systems will be down beginning at 7 a.m. Monday, May 2 through 4 p.m. Friday, May 6.  The BNC staff will be performing appropriate preventive maintenance on the process equipment at this time as well.

All CLEANROOM research work will be suspended until the maintenance activities are completed and all systems are returned to normal.  No one will be allowed to enter the cleanroom during this time period.

In addition, the laboratory areas will also be affected by this systems maintenance.  As such, all LABORATORY activities that involve exhausted hoods, vacuum systems, and/or toxic gas systems will be down beginning 7 a.m. Monday, May 2 through 4 p.m. Friday, May 6.  No chemical work will be allowed during this period.
It is anticipated that the building and most process tool maintenance will be completed by the end of the day on Friday, May 6.  Please check Coral for equipment status and availability.
For long term research planning please refer the following future dates for our future preventive maintenance shutdowns.
                                                May 2, 2016        Oct 17, 2016
                                                May 1, 2017        Oct 16, 2017
                                                April 30, 2018     Oct 15, 2018
Thank you for your cooperation and understanding during these important preventive maintenance shutdowns.



-------------- next part --------------
An HTML attachment was scrubbed...
URL: </ECN/mailman/archives/bnc-all/attachments/20160408/034e1b52/attachment.html>


More information about the BNC-all mailing list